First row of cabs set up

Our first row of cabs was set-up over the weekend. I know I’d be biased but I think they look really well.

CIX data centre racks!

Looking inside the cabs you can see lockable double doors at the back and A and B power strips on either side of the cab.

A look inside the cix data centre cabs

Looking at the floor you can see the PowerPlan data cable hives which we are using to ensure no loss of underfloor air pressure through the data cable openings to the cab.

Similarly, at the back of the cab we have two grommets for the A and B power.
A look inside the cix data centre cabs II

2 Responses to “First row of cabs set up”

  1. Topper Says:

    Nice to see it coming along Tom. You’ll have to invite us up for a look around when it’s done. Cheers.

  2. Adam Beecher Says:

    Thanks Topper. Many prospective customers – and vendors of course – have already visited us in Hollyhill. If you’re in either category, by all means drop us a line.

    Tom should be a long later to reply himself.

Leave a Reply


Copyright © 2007-2009 Chip Electronic Services Ltd. All Rights Reserved. Developed by Beecher Networks.